Click to Enlarge
 
 
 Project Details
Back
 
 Domain  Tyre
 Project Name  Radial Tyre Building Machine
 Client  Siemens, Kalwa
 Consultant  
 Project Highlights Electronic Gearbox
System Configuration
1 PLC/Drives :S7-300, Master Drives Simolink & Profibus.
2 HMI : TP-270.
3 Communication Protocol : Profibus.
4 IO Count : 32 DI,16DO.
5 Software : Simatic Manager .
Project Synopsis

Automation system for cap-strip applicator operation. Electronic Gearing is used between two Servo motors. One servo motor through a gear reducer and timer pulley belt system drives a Shaft on which a cylindrical drum is mounted. Another servo motor is connected to a ball screw which drives a cap strip delivery mechanism. The cap strip has to be applied on to the drum as it rotates like threading operation i.e. For a specified number of revolution of the drum, the cap strip delivery mechanism has to move across the width of the drum to a specified distance.

The scope of work included:

  1. Design of control systems.
  2. Software development .
  3. Commissioning.